Tanks & compliance

Storage Tank (UST) / SPCC Management

Close, upgrade, and stay compliant on fuel and oil storage, from a licensed pollutant storage systems contractor.

Underground storage tank being removedDual-compartment tank being installed
Underground tank removal and a dual-compartment tank installation by GeoTech Environmental.
What it is

What it is, and when you need it.

GeoTech is a licensed Pollutant Storage Systems Contractor. We handle underground storage tank (UST) removal and closure, tank system compliance, Spill Prevention, Control, and Countermeasure (SPCC) planning, and discharge response for gas stations, fleet yards, and industrial sites. Where a closure turns up impact, we run the remediation during the closure rather than as a separate phase.

You likely need this if…

  • You own a gas station, fleet yard, or fuel-using facility
  • A tank is being removed, replaced, or taken out of service
  • You need an SPCC plan for bulk oil storage
  • A tank system failed a compliance inspection
  • A closure turned up a suspected discharge
How it works

How the work gets done.

  1. Plan

    Permitting & Plans

    Engineering plans and the permits a closure or install requires.

  2. Tank work

    Tank Removal or Upgrade

    Remove, replace, or upgrade the system to current standards.

  3. Tank work

    Assess During Closure

    Screen for discharge while the tank is out, not months later.

  4. If a discharge is foundOnly if needed

    Remediate if Needed

    Address impacted soil or groundwater in the same mobilization.

  5. Compliance & close-out

    SPCC & Compliance

    Spill-prevention planning and the records the rules require.

  6. Compliance & close-out

    Close Out

    Documentation the agency, the buyer, and the lender can rely on.

After step 3: Clean closure? Skip straight to SPCC, compliance and close-out.

Plain guidance

What drives cost and timeline.

Number and size of tanks

More and larger tanks mean more permitting, removal, and disposal.

Whether a discharge is found

A clean closure ends quickly; a discharge triggers assessment and cleanup.

System upgrade scope

A straight closure differs from a full replacement or upgrade.

Site conditions

Access, canopy, and paving affect the work and restoration.

See a related case study →

Common questions

Frequently asked questions.

Do you handle both the tank and the cleanup?

Yes. Running assessment and any remediation during the closure saves a separate mobilization and time.

What is SPCC?

A federal Spill Prevention, Control, and Countermeasure plan required for many facilities storing bulk oil above threshold quantities.

Can you close a tank before a sale?

Yes, and documenting the closure removes a common deal-killer for buyers and lenders.

Start a conversation

Not sure what your site needs?

Tell us about it and GeoTech Environmental will give you a straight answer.

GeoTech Environmental, Inc.
954-347-8684info@geotech-usa.com

Assessments, cleanup, tanks, and compliance.

Environmental consultation
GeoTech Environmental, Inc. · 954-347-8684

Geo

Quick property questions · no pressure